The whole adventure started in 1972 when three young men, Odd Strand, Ole Paulsen og Bjørn Paulsen, took the scaffolding department out of the walls – and the painting companies they ran. Today, 50 years later, StS has developed into an organization with 560 employees from 8 different nationalities, stationed in 2 countries with business activity in 10 countries!

ISONOR Industrier
It all started in 1979 (formerly Norisol Norge) and in 2019 ISONOR Industrier celebrated its 40th anniversary. ISONOR Industrier has established itself as a leading Norwegian supplier of insulation, surface treatment, scaffolding and architectural services with its head office in Skien and branch offices in Stavanger, Drammen and Kristiansand.

Anniversary video

Vedlegg-1-Gundere-jubileumsfest

1972

The establishment

When Odd Strand discovered the new steel scaffolding system that came to Norway, he discovered how much easier and safer this could make his working day. He was the first in Western Norway to focus on the new system, and shortly afterwards, in March 1972, he formed the company AS Stillas Service, which laid the foundation for today’s company, StS.

Vedlegg-2.1-Kværner-Stord_03

1977

The Cooperation with Aker Stord starts

StS has been a permanent supplier of scaffolding and rope-access services, truck drivers, crane operators, riggers and transport personnel to the Stord yard since 1977.

CCB

1980

The start of StS and CCB cooperation

Since 1980, StS has been the sole supplier of special services on rigs that have had their annual maintenance on ‘Coast Center Base’ until today. In these assignments, StS has performed significant work within all ISS professions.

aker-stord

1983

Pioneers in Scaffolding

The transition from heavy steel to light aluminum scaffolding in 1983, is characterized as a pioneer initiative in the industry.

1990-1

1990s

Consolidation and modernization

Stillasservice ventured into the nineties with employees at a bare minimum, and lacking significant contracts. But the company had reached the age of majority and would soon experience better times.

1994

1994

Rope Access technology (RAT) and industrial climbing

In 1994, the trade union was expanded to include industrial rope access personnel. It was the first step on the way to a multidisciplinary business.The company Nor Tek is established. The purpose was to specialize personnel to perform work with climbing techniques.

Habitatsystem 1997

1997

First habitat

The development of StS Flexible Habitat solution came to fruition by a challenge we were given by Hydro (now Statoil) and Aibel. Could StS engineer and construct a re-usable habitat system which was safe, quick to erect and versatile?

Njord

1997

Njord

StS has followed the Njord A platform throughout the entire life cycle. We have provided ISS services in addition to industrial rope access and welding habitat over the years.

2000

2000s

The modern StS takes shape

The service range is expanded with Surface and Insulation upon acquisition of ‘Technical Isolation’ and ‘KSK corrosion’. This was in line with a strategy to develop the company into a global supplier within the ISS subjects.

2002

2002

First automatic shutdown system

The oil companies and contractors wanted a more complex system, with focus on eliminating the human factor, and conduct the hot work in as safely a manner as possible.

Oseberg-B-A-D-1-1

2003

First ISS contract

Maintenance & modification assignments offshore in charge of scaffolding / rope access technique, rigging, insulation, surface treatment, passive fire protection and engineering.

2007

2007

Subsidiary in the UK

The first overseas establishment is a fact. September 1, CEO Paul Hancock officially opened the doors of StS Resources & Technology Ltd. In Middlesbrough.

2010

2010s

Exciting assignments

The 2010s can be summed up with exciting challenges such as the low-pressure project at Oseberg Feltsenter, the Mongstad contract with Statoil, the Johan Sverdrup contract with Aibel and StS's 40th anniversary.

NDT 2011

2011

StS focuses on NDT

In mid-April, Anko AS and StS Engineering signed an agreement to acquire Ankos NDT business. The acquisition marks a long-term strengthening of the company’s NDT commitment.

Isolasjonsprodukter 2011

2011

Development of insulation products

StS launches the brand name AnsaTekt, which is a common name of all prefabricated insulation products. In addition to products with fire-insulating properties, the ansaTekt series also includes prefabricated products within cold insulation, thermal and acoustic insulation, exhaust and personnel protection.

Bursdagskake

2012

40th anniversary

For 40 years, StS has focused on the protection of material and human values, work with health, safety and environment, as well as the development of industry standards for insulation, scaffolding and surface treatment.

Njord 2012

2012

Njord

In 2012, ‘Statoil’ implemented a comprehensive maintenance and modification campaign at ‘Njord A’. ‘StS Group’ assisted in changing the deck frame. During the project period, 170 ‘StS Group’ operators were in rotation with work on insulation, scaffolding and surface, access technique, work management and coordination of activities on board.

Mongstad 2013-14

2013-2014

Mongstad

StS pioneered in using technical solutions together developed with our loyal suppliers, like Pinovo, Stopaq a.o. The contract was performed at unit rates and gave StS important experience with this compensation format for future projects.

Livbåt Oseberg Sør

2014

Oseberg Sør

Lifeboat change of 3 of lifeboats at Oseberg Sør. Work carried out in collaboration with Odfjell Drilling Technology and Schat Harding.

Johan Sverdrup 2015

2015

Johan Sverdrup

Performance of the entire scaffolding-scope during the fabrication and construction of the Johan Sverdrup Drilling Platform at Aibels Yard in Haugesund.

Ivan Kran 2016

2016

Ivan Crane

The assignment has been very varied with bolt shifting throughout the wreath tower, removal and installation of electrical cables and removal of engines on top.

Njord

2016

Njord

Njord returns to Stord after 20 years in operation.

dvalin 2017

2017

Dvalin

StS contract with Aibel for scaffolding services for the Dvalin project.

CCB haven

2018

Haven

The leg extension project for Haven is a pioneer project in Europe. The scope has never previously been performed outside the Middle East.

Neptune Energy - Gjøa

2019

Neptune Energy

In December 2018, StS signed a ISS contract with Neptune Energy Norge AS for Operations & Maintenance on the Gjøa platform.

boltcare produkt

2020

Strengthening the product range

The StS group takes over Bilfinger's Lambda products; Jackets, PPS (Pipe Penetration Seal) and Boltcare.

Nordnes sjøbad stupetårn

2020

Nordnes sjøbad

In connection with the 110th anniversary of Nordnes sea bath, StS built an extra high diving tower.The anniversary was celebrated with a diving show and death diving.

CCB Haven Stillas

2020

Business development

According to our stratefy, StS shall be the No. 1 challenger to the ISS suppliers in Norway within Oil and Gas. ISS is an abbreviation for Insulation, Scaffolding and Surface Protection. Over the past year, StS has secured several important ISS contracts and is on the right track in relation to our strategic goals.

StS worker

2020

Vår Energi

ISONOR Industrier has in collaboration with StS been awarded the ISO contract for all of Vår Energi’s installations, Goliat, Balder, Ringhorne and Jotun A.

Jotun FPSO

2021

Jotun A

The production vessel Jotun FPSO has been producing oil from the Balder field in the North Sea since 1999. The ship is at dry dock for upgrading at Rosenberg Worley in Stavanger. The project marks the start of the life extension of the Balder field in the North Sea.

Presentasjon template21

2021

Al Masaiid Oil and Gas

StS gruppen signs exclusive agency agreement with Al Masaood Oil and Gas for promotion of welding habitats and its related ATEX products and services for the UAE market.

Vedlegg-1-Gundere-jubileumsfest

2022

StS celebrates 50 years in operation

Today we mark our foundation day 50 years ago! We celebrate with cake and balloons and recharge for the anniversary party we will have on March 19!

StS-ISONOR logo picture

2023

One company: StS-ISONOR AS

The same unparalleled quality and unwavering commitment to safety that defined our individual paths is now merged to form a formidable partnership.